About Green and Gold Energy

 

Mission:

Our mission is to build GW (1,000 MWs) class SunCube manufacturing factories world wide, enabling the construction of GW class SunCube™ based solar farms worldwide and making available the CO2 free kWhs to a carbon constrained world.
 

Goal:

Our goal is to reduce the delivered cost of SunCube kWhs to that available from fossil fueled electricity generators. GW class SunCube based solar farms then become a sensible, financial and logical choice for all electricity utilities worldwide.

Strategy:

Our solar strategy is to dramatically exceed the cost effectiveness of existing PV flat panels through focused innovations in both the effective collection of solar energy (peak kWs) and the generation of maximum annual electric power (kWhs).

Execution:

To execute this program, our design and development teams are working on the innovative and ground breaking "SunCube™". Featuring a high efficiency (>35%) solar energy harvester, smart dawn to dusk "Max kWh™" internal 2 axis sun tracker and "Cool PV™" low operational CPV cell temperature. Extensive testing is being done to ensure 25+ years of life and high reliability. Once these characteristics are achieved, GW class SunCube™ manufacturing factories and solar farms will be constructed worldwide and the SunCube™ generated kWhs made available to a carbon constrained world.